
Featured
- 
            
              Difference between Boundary Value Analysis and Equivalence PartitioningBoth Boundary Value Analysis and Equivalence Parti by vinay.kumar
- 
            
              7 Principles Of TestingTesting shows presence of defects: Testing identi by mayank.thapliyal
- 
            
              Bug life cycleBelow are the state of any bug by which bug goes by vishwanath.rana
Tags
V-Model: Advantages And Disadvantages
                      V-Model stands for the ‘Verification’ and ‘Validation’ Model. Same as the waterfall model, V-Model also applied as a consequent life cycle model. In the V-model, every stage should be accomplished ahead the next stage star... 
                      What is V-model and its advantages
                      V-model stands to verification and validation models and is a software development model. V-model was introduced with the intent to implement testing right from the requirement  phase. In other software development models like Waterfall model tes... 
                      V-model and Phases of V-model
                      V-model stands for Verification and Validation model. In this model testing of the product is planned in parallel with a corresponding phase of development. There are various phases of the V-model.
Phases of the V-model are as follows:
Requ... 
                       
        
        
 
        
         
        
        